Main pageSite map

News

«Samara Plaster Plant», CJSC has had the production equipment capital repair of ten areas

19.01.2008

«I always like to solve non-standard goals», — said Gennadiy Afanasevich Barinov, an lead mechanic. How is to dismantle the equipment, assemble and set to work the new equipment for 17 days? When Mr. Rizhov, engineering manager set this problem, I was sure it is impossible. But after careful elaboration and technical preparation we have done a good job. We wish to mention Morozov, Volgushkin, Alyusov, Galanov.