Main pageSite map

News

Kaizen on the Samara Plaster Plant

03.07.2009

Repair time of the equipment for natural stone chipping reduced sixfold and the current consumption per day is reduced by 13,4 kw on the Samara Plaster plant. Unnecessary losses are minimized thanks to ideas of Platoshnik and Bazanov, employees of chief power engineer service.